In the eye of Storm Arwen: the true cost of lost power

In the eye of Storm Arwen: the true cost of lost power

This week, Storm Arwen wreaked havoc across the UK, with tens of thousands of homes and businesses experiencing power cuts. At one point on Friday 26th November, 74,000 customers were without power in England’s North West region, along with a further 88,000 in...
The critical role of data center uptime during the COVID-19 crisis

The critical role of data center uptime during the COVID-19 crisis

Data centre uptime: Crestchic Loadbanks, a leading supplier of load testing equipment based in the UK, has reported strong growth so far this year, with a significant amount of business coming from the growing data center market. As the world reels from the impact of...
Crestchic Loadbanks reach new heights with 22 Bishopsgate project

Crestchic Loadbanks reach new heights with 22 Bishopsgate project

Crestchic Loadbanks has supplied load testing solutions for one of London’s tallest and most high-tech tower blocks, heling to ensure that back up power systems will operate in the event of a power failure. At 288 metres high, 22 Bishopsgate is one of the tallest...