


Three reasons why factory testing your backup generator is not enough
When installing a new backup generator or uninterrupted power supply (UPS), many businesses still wrongly believe that factory performance testing before the equipment is shipped is enough to ensure reliable operation once installed. Here, we explore why this is not...
Load Bank Control: New control module GEMINI delivers data from MV supply
Load bank control: In addition to NOVA and ORION (mentioned last week – read more here: https://crestchic-usa.com/fibre-optic-nova-control-system-is-a-winner-with-customers/), our tech team have developed the load bank control module, Gemini, for the medium...
Crestchic transforms NOV’s power testing
Crestchic, one of the leading manufacturers of loadbanks and packaged transformers, has secured a fifth order from NOV Portable Power for a 4.0 MVA step-up containerised transformer to support a series of offshore power installations. The end result provided NOV...