POWER RELIABILITY FOR CAIRO AIRPORT CONTROL TOWER

POWER RELIABILITY FOR CAIRO AIRPORT CONTROL TOWER

Cairo International Airport is one of the busiest aviation hubs in Africa and the Middle East. With as many as 682 flights in a single day, the airport relies on highly reliable, uninterrupted power for its critical operations. At the very heart of these operations...
Storm Goretti highlights the need for robust backup power

Storm Goretti highlights the need for robust backup power

Crestchic Loadbanks is urging businesses across the UK to review their power-continuity plans as Storm Goretti brings heavy snowfall, strong winds and electricity disruptions nationwide. The Met Office has warned that 73 areas across the UK are at risk of power cuts...
Crestchic Completes Major Load Testing Project in Saudi Arabia

Crestchic Completes Major Load Testing Project in Saudi Arabia

Crestchic has completed load testing for a major data centre project in Saudi Arabia. The testing was carried out using Crestchic rack-mounted load banks for both Level 4 (L4) and Level 5 (L5) testing within the data halls. A total of 1,550 rack-mounted load banks...
Crestchic to Exhibit at DataCentres Ireland 2025

Crestchic to Exhibit at DataCentres Ireland 2025

Crestchic Loadbanks will be exhibiting at DataCentres Ireland 2025, taking place on 19–20 November at the RDS, Dublin. Now in its 15th year, the event is recognised as the country’s leading forum for the data centre community, bringing together operators, developers,...
Crestchic: Proud sponsor of the 2025 AMPS Awards for Excellence

Crestchic: Proud sponsor of the 2025 AMPS Awards for Excellence

Crestchic Loadbanks is delighted to confirm its sponsorship of the Project of the Year Award at the 2025 AMPS Awards for Excellence. Organised by the Association of Manufacturers and Suppliers of Power Generating Systems (AMPS), the event celebrates outstanding...