Vessel testing: Leading specialist in the construction and repair of vessels in the offshore area, Estaleiro Navship, commissioned Crestchic to complete futureproof upgrades to its load bank control system, replacing all elements and installing new insulated elements...
POWER FAILURE: On 24th May 2023, Manchester Airport hit the headlines, as a power outage saw check-in desks closed, flights grounded, and customers left frustrated and angry. As the airport contends with the aftermath, including passengers who watched their flights...
SHIPBUILDING INDUSTRY: CRESTCHIC COMPLETES LOAD BANK UPGRADE FOR ONE OF THE WORLDS LARGEST SHIPBUILDING GROUPS A global multinational shipbuilder and cruise ship designer appointed Crestchic Loadbanks to deliver a significant programme of upgrades to four 5.5 MW load...
In May 2023, Crestchic participated in the first-ever Data Center World Build Conference in Austin, TX. Steven Bacon, Business Development Manager at Crestchic, shares his five top takeaways from the event. Efficiency is key: During the two-day conference, there was...
Naval Applications: Crestchic delivered formal load bank training to one of the most powerful naval forces in the world following the arrival of its 3000 kVA, 3-phase load bank with NOVA control hardware and Orion user interface. Arriving onsite, Steven Jewell,...