In May 2023, Crestchic participated in the first-ever Data Center World Build Conference in Austin, TX. Steven Bacon, Business Development Manager at Crestchic, shares his five top takeaways from the event. Efficiency is key: During the two-day conference, there was...
Naval Applications: Crestchic delivered formal load bank training to one of the most powerful naval forces in the world following the arrival of its 3000 kVA, 3-phase load bank with NOVA control hardware and Orion user interface. Arriving onsite, Steven Jewell,...
Germany: Crestchic has delivered essential upgrades to the load bank controller system for one of Germany’s largest data centres. Due to advancements in microprocessor technology, components for the site’s Eclipse 3.1 load bank control system were becoming obsolete,...
Crestchic USA will be showcasing a range of load banks at the forthcoming Data Center World event in Texas. The event, which takes place at Austin Convention Center, 8-11 May, is billed as the leading digital infrastructure event designed for data center...
Arkansas-based generator maintenance business, Veteran Power Solutions, has appointed Crestchic in Texas as its primary load bank supplier, citing cost savings, delivery speed, and customer services as the main drivers. Generator testing specialists Despite being a...
Backup power: Until now, renewable energy plants in Germany have not been set up for emergency power supply in the event of a power outage. That is about to change, thanks to the award-winning LINDA research project – and Crestchic’s load bank technology is a...