Massive blackout highlights the need for robust backup power
On April 28, 2025, a massive and sudden power outage struck large parts of Spain and Portugal, causing disruption to daily life and halting essential infrastructure - with the Spanish government citing the event as “the worst power outage in the country’s recent...

WHY USE A LOAD BANK?
Load banks are primarily used for testing electrical power output on diesel generators, gas turbines and UPS systems whilst carrying out commissioning and maintenance work.
The load banks are used for simulating real electrical loads enabling essential setup and commissioning which ensures that all electrical and control parameters are met prior to power generation/back up equipment being energized on line.